EMO 2017

Cutting-edge control on machines for Industry 4.0 needs

| Editor: Briggette Jaya

The innovative MVR1200R Connect next-generation machine was premiered at EMO Hanover, Germany, recently with a new control and simplified operation.
Gallery: 3 Pictures
The innovative MVR1200R Connect next-generation machine was premiered at EMO Hanover, Germany, recently with a new control and simplified operation. (Source: Mitsubishi Electri)

Mitsubishi Electric premiered two of the company’s high-performance wire-cutting machines from the MV-R Connect series, MV1200R and MV2400R with a new control and simplified operation, at EMO Hanover recently.

According to Mitsubishi Electric, these EDM machines now display the output of numeric values as easy-to-read graphics. The new manual control box features a bright, user-configurable display and has a freely rotating and pivoting 48cm-multitouch display for the operator’s ease of use.

The built-in cost and performance monitor enables the user to analyse machine profitability and see reserves to optimise processes and boost efficiency. Diagrams are available, which depict operating costs and output. All operating material statuses and maintenance cycles can be called up at a touch, and can even be read out. The machine comes with a network connection; USB, FTP, DNC and open data interfaces, and can be linked up to existing production planning and analysis systems, the company explained.

Toolmaker time travel from 1921 to 2021

MEX 2017

Toolmaker time travel from 1921 to 2021

05/17/2017 - Mitsubishi Electric invites Moulding Expo visitors on a trip through time. To fully understand the development of machine tools, Mitsubishi will present its own history, from its founding into the near future in 2021. The immersive experience lets visitors experience landmarks of the company's history. read...

In line with Industry 4.0 requirements, the processable data available with these machines ensures transparency in all production stages. Intel Security is also pre-integrated to provide security.

The new Job Planner makes it possible to bring forward urgent jobs, with automatic savings of the parameters of interrupted jobs. This allows for the continuation of these jobs at another time from the point of interruption. The control also guides less experienced users through the cutting process, step-by-step.

The MV1200R Connect and MV2400R Connect are expected to be available from November 2017.

Experienced with wire-cut EDM systems for generations

Case Study: Mitsubishi Electric

Experienced with wire-cut EDM systems for generations

04/10/2017 - You don’t often hear of someone claiming to have been surrounded by wire-cut EDM systems as a child. But Andreas Hornung, the managing director of Hornung, fondly remembers the machines of his father’s firm. Today, the company is equipped with several machines from Mitsubishi Electric. read...

Comments are being loaded ....

Leave a comment
  1. Avatar
    Avatar
    Edited by at
    Edited by at
    1. Avatar
      Avatar
      Edited by at
      Edited by at

Comments are being loaded ....

Report comment

Kommentar Freigeben

Der untenstehende Text wird an den Kommentator gesendet, falls dieser eine Email-hinterlegt hat.

Freigabe entfernen

Der untenstehende Text wird an den Kommentator gesendet, falls dieser eine Email-hinterlegt hat.

copyright

This article is protected by copyright. You want to use it for your own purpose? Infos can be found under www.mycontentfactory.de (ID: 44923043 / EDM)